HOME PAGE
ABOUT PIVOT
PIVOT BUSINESS
PIVOT PROJECTS
CONTACT US
SITE MAP
   
 
 
 
 
 
1. Switching Station (4 x 15MVA, 33 /11 KV) for FCDA at the 3 Arms Zone Switching Station Abuja.
 

JOB DESCRIPTION

(a) Supply and Installation of CT, VT, Distance protective relay and circuit breakers.

(b) Transformer substations – 14 No 33KV indoor SF6 Breakers
- 28 No 11KV indoor SF6 Breakers.

2. 132KV transmission line / substation at Owerri, Ahoada, Yenogoa for NEPA.
 

JOB DESCRIPTION

Owerri – Ahoada – 73km, Ahoada – Yenogoa – 46km, Yenogoa – Imiringi – 20km, 33KV double circuit lines.
Ahoada – abonema – 53km, Ahoada outfeeder – 2km, 2 x 30 / 40MVA 132/33KV

Ahoada substation 2 x 30/40MVA 132 /33KV

3. 132KV double circuit (74km) transmission line at Alaoji (Aba) Umuahia for NEPA

 

 

4. Switching Station (2x15MVA, 33/11kV) at Embassy/Lugbe Switching station for FCDA.

 

JOB DESCRIPTION

Supply and Installation of CT, VT, Distance protective relay, circuit
breakers.

5. 132kV Substation reinforcement, Abeokuta for NEPA

 

JOB DESCRIPTION

- Supply and Installation of CT, VT, Distance protective relay, circuit
breakers.

 
 
  LEGAL | DISCLAIMER
HOME PAGE | ABOUT US | OUR BUSINESS | PROJECTS | CONTACT US | SITE MAP
© 2010. PIVOT ENGINEERING LIMITED. All Right Reserved.